Final leg of The Alpine Way past Murray 1 Power Station, part of the Snowy Hydro electric…
HQ
…scheme. “One of the seven engineering wonders of the world” which “provides 11% of the [national electric grid]”.
Coming down the west side of The Great Dividing Range, the car added 7% charge from the regenerating (going down a hill puts power back into the battery).
Then along the Murray Valley Highway beside Tallagatta Creek (which appears to have been dammed).